Stem Wall Inspection Passed
Orange County Building Inspector approved the stem wall construction: proper block placement, mortar joints, vertical rebar placement, and horizontal bond beams all verified. Ready for MEP rough-ins and pour.
Orange County Building Inspector approved the stem wall construction: proper block placement, mortar joints, vertical rebar placement, and horizontal bond beams all verified. Ready for MEP rough-ins and pour.
Conservation Area Determination filed with Orange County EPD to establish official wetland boundaries and buffer requirements.
Formal wetland report delivered with soil analysis, plant species identification, and wetland classification.
Comprehensive survey package delivered — boundary, topography, tree locations, and wetland markers in one document.
NGP approved by Orange County — authorizes construction within buffer zones under specific monitoring and reporting conditions.
Final site plan approved after multiple revisions — wetland buffers, stormwater, setbacks, and driveway placement all confirmed.
Footer trenches excavated and rebar installed — critical: ground rod must be bonded to rebar BEFORE pour for electrical inspection.