Stem Wall Cores Filled

Pumped concrete grout into stem wall block cavities, encasing the vertical rebar and creating a solid, reinforced foundation wall. This completes the foundation structure.

Pro tip: Use a concrete pump truck for filling cores — trying to pour and rod grout into block cavities by hand leaves voids. The pump ensures complete fill around all rebar.

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *