Foundation Footers Poured
Two concrete trucks arrived at dawn to pour the footers. Timing is critical — concrete must be placed and finished before it begins to set. Footer dimensions and concrete strength (PSI) specified by the structural engineer.
Pro tip: Schedule your pour for early morning — Florida afternoon heat accelerates concrete setting time significantly and makes finishing much harder.