Electrical Bonding Inspection Passed

Electrical inspector verified proper grounding: 20-foot ground rod installed and bonded to footer rebar with approved connectors. This creates the electrical grounding system for the entire structure.

Pro tip: Schedule the electrical bonding inspection at the same time as the footer inspection — the electrical inspector and building inspector can sometimes visit the same day, saving you time.

Schedule via Orange County Fast Track

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *