Stem Wall MEP Rough-In
Under-slab MEP rough-in complete — waste lines, supply runs, and conduit sleeves must be installed before stem wall cores are filled.
Under-slab MEP rough-in complete — waste lines, supply runs, and conduit sleeves must be installed before stem wall cores are filled.
Electrical bonding inspection passed — 20-foot ground rod bonded to footer rebar creates the structure’s complete grounding system.
Footer trenches excavated and rebar installed — critical: ground rod must be bonded to rebar BEFORE pour for electrical inspection.